September 7 Update

As you can see from the most recent posted pictures the contractor is working in several areas at the same time. The “07″ side wall and balconies should be open by the end of this week as long as the rain stays away. This will mean that the pool will finally be open for regular use. That swing stage will most likely be moved to the “04″ balcony side wall. With the long swing positioned at the “04″ north facing wall, the exit from the building to the beach will be closed during working hours. Access to the beach will be out the front door and around the north side gated area. The gate from the pool to the beach...